The intention of this blog is only to share the collections. Inadvertently if any file is under copyright, please intimate me so that it can be removed forthwith.
Showing posts with label Innovation - Great. Show all posts
Showing posts with label Innovation - Great. Show all posts
Tuesday, April 5, 2022
Monday, September 5, 2011
The Real Grass-roots Innovation by Indian wins Best Product Design!
When I saw this low-cost low-tech simple yet extremely useful Product design – I was quite amazed as to why have we not seen it as yet. It would have saved back aches of thousands, if not millions of people who carry / push load on daily basis.
In a contest arranged by Core77, the product – Load Carrier for Labor – designed & created by Vikram Dinubhai Panchal of The National Institute of Design (NID), Ahmedabad won in the product / equipment category!
This winning product was made at a miniscule cost of Rs. 300 and has potential to affect lives of millions of people across the globe. “Load carrier for labor” project aims to improve the working condition of labourers and workers at many places globally like construction site, factories, ports, railway stations, etc The objective is to prevent various occupational hazards and demonstrating Product design and ergonomic consideration in welfare of human life.
[A push cart as well as a backpack which can pick-up heavy loads]
[To carry Loads overhead with ease]
[and a pushcart as well...]
Won’t this Rs. 300 product be a dream come true for labourers who carry heavy loads day-in and day-out. This is the Real grass-roots innovation!
You can check out the details of this product by visiting their product page.
In a contest arranged by Core77, the product – Load Carrier for Labor – designed & created by Vikram Dinubhai Panchal of The National Institute of Design (NID), Ahmedabad won in the product / equipment category!
This winning product was made at a miniscule cost of Rs. 300 and has potential to affect lives of millions of people across the globe. “Load carrier for labor” project aims to improve the working condition of labourers and workers at many places globally like construction site, factories, ports, railway stations, etc The objective is to prevent various occupational hazards and demonstrating Product design and ergonomic consideration in welfare of human life.
Load Carrier for Labourer Pictures
[A push cart as well as a backpack which can pick-up heavy loads]
[To carry Loads overhead with ease]
[and a pushcart as well...]
Won’t this Rs. 300 product be a dream come true for labourers who carry heavy loads day-in and day-out. This is the Real grass-roots innovation!
You can check out the details of this product by visiting their product page.
Sent by Ms. Priya Ashok
Thursday, April 15, 2010
AMAZING : Concept - The train that never stops at a station:
*A brilliant new train innovation - get on & off the bullet train without
the train stopping. VERY COOL CONCEPT !*
*No time is wasted. The bullet train is moving all the time. If there are
30 stations between ** Beijing and Guangzhou, just stopping and
accelerating again at each station will waste both energy and time. *
*A mere 5 min stop per station (elderly passengers cannot be hurried) will
result in a total loss of 5 min x 30 stations or 2.5 hours of train journey
time!*
*How it works (view the movie - in mandarin though!):*
1. For those who are boarding the train : The passengers at a station
embarks onto to a connector cabin way before the train even arrives at the
station. When the train arrives, it will not stop at all. It just slows down
to pick up the connector cabin which will move with the train on the roof
of the train.
While the train is still moving away from the station, those passengers will
board the train from the connector cabin mounted on the train's roof. After
fully unloading all its passengers, the cabin connector cabin will be moved
to the back of the train so that the next batch of outgoing passengers who
want to alight at the next station will board the connector cabin at the
rear of the train roof.
2. For those who are getting off: As stated after fully unloading all its
passengers, the cabin connector cabin will be moved to the back of the train
so that the next batch of outgoing passengers who want to alight at the next
station will board the connector cabin at the rear of the train roof. When
the train arrives at the next station, it will simply drop the whole
connector cabin at the station itself and leave it behind at the station.
The outgoing passengers can take their own time to disembark at the station
while the train had already left. At the same time, the train will pick up
the incoming embarking passengers on another connector cabin in the front
part of the train's roof. So the train will always drop one connector cabin
at the rear of its roof and pick up a new connector cabin in the front part
of the train's roof at each station.
Innovation?
Please click here
If you are astonished by this innovation, read this LINK to know about Moving walk away which is already in use.
the train stopping. VERY COOL CONCEPT !*
*No time is wasted. The bullet train is moving all the time. If there are
30 stations between ** Beijing and Guangzhou, just stopping and
accelerating again at each station will waste both energy and time. *
*A mere 5 min stop per station (elderly passengers cannot be hurried) will
result in a total loss of 5 min x 30 stations or 2.5 hours of train journey
time!*
*How it works (view the movie - in mandarin though!):*
1. For those who are boarding the train : The passengers at a station
embarks onto to a connector cabin way before the train even arrives at the
station. When the train arrives, it will not stop at all. It just slows down
to pick up the connector cabin which will move with the train on the roof
of the train.
While the train is still moving away from the station, those passengers will
board the train from the connector cabin mounted on the train's roof. After
fully unloading all its passengers, the cabin connector cabin will be moved
to the back of the train so that the next batch of outgoing passengers who
want to alight at the next station will board the connector cabin at the
rear of the train roof.
2. For those who are getting off: As stated after fully unloading all its
passengers, the cabin connector cabin will be moved to the back of the train
so that the next batch of outgoing passengers who want to alight at the next
station will board the connector cabin at the rear of the train roof. When
the train arrives at the next station, it will simply drop the whole
connector cabin at the station itself and leave it behind at the station.
The outgoing passengers can take their own time to disembark at the station
while the train had already left. At the same time, the train will pick up
the incoming embarking passengers on another connector cabin in the front
part of the train's roof. So the train will always drop one connector cabin
at the rear of its roof and pick up a new connector cabin in the front part
of the train's roof at each station.
Innovation?
Please click here
If you are astonished by this innovation, read this LINK to know about Moving walk away which is already in use.
Subscribe to:
Posts (Atom)

